Welding work
Inflowing medium
16
Fig. 6: Mounting socket
When welding the socket, make sure that the socket is flush with the
vessel top.
1
Fig. 7: Socket must be installed flush
1
Unfavourable mounting
2 Socket flush - optimum mounting
Before beginning the welding work, remove the electronics module
from the sensor. By doing this, you avoid damage to the electronics
through inductive coupling.
Do not mount the instruments in or above the filling stream. Make sure
that you detect the product surface, not the inflowing product.
SITRANS LG270 - Operating Instructions
d
DN40 ... DN150
> DN150 ... DN200
d
2
h
≤ 150 mm ( 5.91")
≤ 100 mm (3 .94")
PBD-51041506