Connect the IntelliChlor Cells
1. Connect the cell power connector, labeled PRIMARY (CIC60P), into the receptacle on the
bottom of the power center labeled PRIMARY. While holding the connector on the receptacle,
turn it slowly until the plug pins are inserted into the receptacle, then twist the to lock in place.
2. Plug the five SECONDARY cell power connectors into each of the power centers labeled
SECONDARY using same method as described in step 1.
Primary (CIC60P) connector
Primary (CIC60P)
power center receptacle
PRIMARY
SECONDARY
SECONDARY
SECONDARY
IntelliChlor Electronic Chlorine Generator COMSYS-12 Installation Guide
Secondary connector
Secondary power
center receptacle
CPC103
SECONDARY
CPC203
SECONDARY
7