Pentair INTELLICHLOR COMSYS-12 Installation Manual page 5

Salt chlorinator commercial system

Advertisement

4
Connect AC Power Wires and ORP Sensor Wires
4. Splice the incoming AC power wires onto the two wires labeled WIRED FOR 220V. Do not
apply AC power yet.
5. Connect the two (2) twisted wires labeled ORP SENSOR to the ORP chlorine controller panel
(AcuTrol, etc., not provided in kit). Carefully place the connection inside of power center.
6. Replace the cover on the upper Primary power center and lower Secondary power center. Secure
each cover with the retaining screw.
Connect these
wires to AC
power source
Communication
wires
Splice in junction box
(see STEP 4)
IntelliChlor Electronic Chlorine Generator COMSYS-12 Installation Guide
(Continued)
Connect these
wires to ORP
PRIMARY
SECONDARY
PRIMARY
Secondary
SECONDARY
Secondary
Secondary
Secondary
Secondary
CPC103
CPC103
CPC203