Installation; Unpacking And Inspecting The Shipment - ADC HRE-506 User Manual

Table of Contents

Advertisement

150-506-100-03
I
NSTALLATION
This section describes the HRE-506 installation, including the following:

Unpacking and Inspecting the Shipment

Mounting
Grounding
Installing Doubler or Repeater Units
Detaching the Dome from the Baseplate
Opening the Enclosure
Closing the Enclosure
Pivoting the Enclosure
U
NPACKING AND
When you receive the equipment, inspect it for signs of damage. If damage has occurred, immediately report the
extent of damage to the transportation company and to ADC. For additional information, see
Product Support" on page
Your shipment should consist of:
One HRE-506
HiGain Remote Enclosure HRE-506 List 1 and List 2 Technical Practice
Before installing the HRE-506, unpack and inspect the shipment for missing components and physical damage
that may have occurred during shipping.
To unpack the enclosure:
1
Remove the HRE-506 from its shipping carton. Verify that all the equipment listed on the packing list is
present.
2
Inspect the HRE-506 enclosure, card cage, and O-ring for shipping damage.
If the equipment has been damaged in transit, immediately report the damage to the transportation company
and to your sales representative. Order replacement equipment, if necessary.
3
Locate and loosen the retaining screws at the rear base of the card cage.
4
Tilt the card cage on its hinge. Lower the card cage to its level position and tighten the screws to lock in
position. ADC recommends that the card cage be kept in a level, locked position.
If you must store the equipment for a prolonged period of time, store it in the container
shipped with your equipment.
HRE-506 List 1 and List 2
I
NSPECTING THE
44.
March 28, 2000
S
HIPMENT

Installation

"Appendix C -
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

150-2204-01150-2204-02

Table of Contents