Field Assembly - UTICA BOILERS SFH 5 Series Installation, Operation & Maintenance Manual

Water oil fired cast iron boiler
Table of Contents

Advertisement

1.
Install oil burner� Follow burner manufacturer
specific instructions for installation.
• Check oil nozzle in burner for size, angle and type,
inspect electrode settings, check head setting,
check air band and air shutter settings� See "Oil
Burner, Nozzle, & Air Settings" �
• DO NOT install burner without gasket� Place oil
burner gasket on face of burner swing door with 4
burner flange bolts installed part way.
• Align round part of key hole slots of burner flange
with burner door bolts� Turn burner to lock in place�
• Tighten all 4 cap screws using diagonal sequence�
• Plug burner power cord into burner harness�
• Attach flexible oil hose included in parts box.
• Connect burner quick connect to corresponding
High Limit Control harness� See Figure #22�
2.
Follow circulator manufacturer specific instructions
included with circulator if appropriate�

11 - FIELD ASSEMBLY

20
PN 240013073, Rev. A [08/31/2020]

Advertisement

Table of Contents
loading

Table of Contents