Dosing Pump Prime Procedure - Hanna Instruments HI84529 Instruction Manual

Titratable acidity mini titrator & ph meter for dairy products
Table of Contents

Advertisement

13. DOSING PUMP PRIME PROCEDURE

Prime cycle should be performed:
• if there is no titrant in the tip
• whenever the dosing system tubes are replaced
• whenever a new bottle of titrant is used
• before starting a pump calibration
• before starting a series of titrations
The prime cycle is used to fill the syringe before starting a set of titrations.
Two rinse cycles of the syringe are shown in the figure below. The dispensing tube is connected to the
top of the valve and the aspiration tube on the left side.
Notes: The aspiration tube must be inserted in the titrant bottle. The dosing tip must be placed
over a rinse beaker.
Before starting the prime procedure, make sure the appropriate titrant solution is used for the
selected range.
• To prime the burette, select Prime option from Titration mode.
• Adjust the rinses number by pressing the ARROW keys and press Start.
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hi84529u-01

Table of Contents