Service manual
49 Ease the other end of the yoke
assembly onto the motor bucket
ensuring the motor wires are
pulled through first.
50 Fit the yoke loom carrier.
51 Before fitting the yoke assembly
and motor bucket onto the duct
ensure the internal cable wires are
located into the channels on the
duct.
22