Page 1
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com OPERATION MANUAL FVS25E Vibratory screed Machine P E R F O R M A N C E · E F F I C I E N T · R E L I A B L E...
Page 2
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com Master sincerely thanks you for selecting the Concrete Cutting Machine. For your Safety and proper operation, before you start to operate or carry out any maintenance on this equipment, YOU MUST READ and STUDY this manual carefully.
Page 3
After reading through this manual thoroughly you will find that you can do some of the regular maintenance yourself. However, when in need of parts or major service be sure to see your Master dealer. For your convenience we have provided this space to record relevant data about your concrete vibratory screed.
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com for optimum compaction and production of the slab placement. SAFETY PRECAUTIONS 1. Before starting operation, the operator has to check that all control and safety devices function properly. 2. NEVER allow anyone to operate this equipment without proper training. People operating this equipment must be familiar with the risks and hazards associated with it.
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com 2. DO NOT smoke while operating the machine. SERVICE SAFETY Warning! Poorly maintained machines can become a safety hazard! In order for the machine to operate safely and properly over a long period of time, periodic maintenance and occasional repairs are necessary.
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com STARTING ENGINE 1. Turn engine switch to “ON”. 2. Choke engine if necessary (you may not need to choke a warm engine). 3. Pull starter rope repeatedly until engine starts. 4. If choke was moved to the closed position to start, gradually move it to the open position as the engine warms up.
Page 7
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com 2. Run the Screed between the wet pads to create two parallel strips (B) that define the grade for the remainder of the wet screeding. These strips should be 300-500 wide. Place one end of the float blade on each of the parallel strips (B) and screed the concrete (C) in between the strips.
Page 8
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com TRANSPORTING It is recommended to transport the Screed with the float bar removed. The float bar is more likely to be damaged if attached to the main unit during transport. STORAGE following steps...
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com needed Shockmount Check for cracks × × or tears MAINTENANCE SCHEDULE ENGINE MAINTENANCE Refer to the engine owner’s manual for maintenance intervals and procedures. ENGINE SPEED The idle speed of the engine should not exceed the following:...
Page 10
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com DIAGRAM 1. VS25 screed assembly Item Part no. part name...
Page 15
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com Item Part no. part name 1001701 Shaft pin 1001702 Rubber ring 1001703 Flange 1001704 Gasket 6 1001705 Screw 6×20 1001706 Retaining ring 52 1001707 Washer 12 1001708 Bearing 6205-2RS 1001709 Lock Nut 12...
Page 16
The Master warranty policy is designed to achieve business agility and provides you with different options to protect your valuable assets. In this document you will find all you need to know about Master Warranty in terms of Duration, Coverage and Customer service.
Page 17
(such as engine tune-ups and oil & filter changes). The warranty also does not cover normal wear and tear items (such as belts and consumables). Master's warranty does not cover the defect resulted from operator abuse, failure to perform normal maintenance on the product, modification to product, alterations or repairs made to the product without the written approval of Master.
Page 18
Henan Master Machinery Co., Ltd Tel:(+86)17737606271 www.mastermachinerys.com avoid examination fees on devices that are not actually damaged, we are eager to assist you with remote troubleshooting and seek every possible way to fix the device without the unnecessary time and expense of returning the device for repair.