Installing A Power Supply; Removing A Power Supply - HP HPE FlexFabric 5944 Series Installation Manual

Table of Contents

Advertisement

Installing a power supply

The installation procedure is the same for different models of power supplies. The following
procedure installs a PSR450-12A power supply on an HPE 5944 48XGT 6QS28 switch.
To install a power supply:
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
2.
Unpack the power supply and verify that the power supply model is correct.
3.
Correctly orient the power supply with the lettering on it upward. Grasp the handle of the power
supply with one hand and support its bottom with the other, and slide the power supply slowly
along the guide rails into the slot. Make sure the power supply has good contact with the
backplane.
To prevent connector damages, insert the power supply gently. The power supply and power
supply slot have disorientation rejection designs. If you encounter a hard resistance while
inserting the power supply, pull out the power supply and insert it again.
Figure2-20 Installing a power supply
IMPORTANT:
If the target power supply slot has a filler panel installed, first remove the filler panel from the slot (as
shown Figure2-21).
Figure2-21 Removing the filler panel from a power supply slot

Removing a power supply

CAUTION:
When the switch has two power supplies in 1+1 redundancy mode, removing one power supply
does not affect the operation of the switch. When the switch has only one power supply installed,
removing the power supply powers off the switch.
2-18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpe 5944 48xgt 6qs28

Table of Contents