On panels with pre-assembled low-voltage compartments, up to 2 transport blocks are mounted.
The transport blocks can be removed before installation work is started. The transport eyes must
be removed before installation work is started.
1. Unscrew the bolted joint and remove the transport eyes and/or transport blocks.
4x
4x
Fig. 34: Removing transport blocks
Transport block
1
up to 16 kA)
The pressure relief duct for panel blocks with IAC A FLR up to 16 kA/1s (option) is pre-assembled
at the factory as standard. The pressure relief duct can be supplied separately on request.
Fig. 36: Mounted pressure relief duct
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
Fig. 35: Removing transport eyes
Transport eye
2
1
Pressure relief duct