IBM T-117 Installation And Maintenance Manual page 36

17″ 1 u flat panel monitor console kit
Hide thumbs Also See for T-117:
Table of Contents

Advertisement

7. Carefully set the new keyboard into the tray; then, route the
8. Secure the keyboard-and-mouse cable to the cable-management arm using the
9. Reconnect the keyboard-and-mouse cable to the server or console switch.
Note: When the monitor and keyboard are not in use, if the rack cabinet is in a
26
IBM 17" 1 U Flat Panel Monitor Console Kit: Installation and Maintenance Guide
keyboard-and-mouse cable through the cord clip on the bottom, up through the
opening on the right side of the tray, and toward the cable-management arm.
Pull the full length of the cable through the opening.
existing cable straps.
vibration-prone area, or during cabinet relocation, tighten the two
thumbscrews on the front of the tray to secure the tray inside the rack
cabinet.
Keyboard-and-mouse
cable routing
Thumbscrew

Advertisement

Table of Contents
loading

Table of Contents