Installing Lighted Shelves; Important - Hussmann RI1 Installation And Operation Manual

Ri & si series island and multi-deck island cheese & deli
Hide thumbs Also See for RI1:
Table of Contents

Advertisement

S
4-4
TART UP
PROCEDURE FOR INSTALLING LIGHTED
SHELVES WITH SINGLE-PRONG
CONNECTOR
Shelf lighting uses parallel
wiring. Please follow these
instructions to ensure good
contact between male and
female connectors.
1. SHUT OFF POWER TO CASE. REMOVE
ALL SHELVES.
2. Engage each power socket cap and ensure
that each cap is fully seated before cleaning.
Ensure the proper seating of the cap at all
times when the plug is not engaged.
R
I
G
H
T
3. Clean the merchandiser as described in the
Care and Cleaning paragraphs of Section 5 –
Maintenance. Keep liquid out of sockets.
Socket with Cap Installed
P/N 0446551_A
/ O
PERATION
W
R
O
N
G
Example
Always work Left to Right, and Bottom to Top
4. Verify that power is at the case and turned on.
Verify that the case light switch is turned
"OFF." Switch is located in the canopy, on
the left, behind first row of lamps.
Canopy Light Switch Location
5. The illustration below shows a typical case.
Note that other models will have fewer rows
of shelves.
Starting from the left-hand bottom section,
choose the location for the first shelf, X-1.
Secure the shelf in the slotted upright. Make
certain that the shelf is level and that ends are
in the same slot on the left and right upright.
It is important that shelf brackets be proper-
ly seated in the slotted upright.
6 Sockets in
8 ft (2438 mm) Case
X-8
X-7
X-5
X-4
X-2
X-1
9 Sockets in
12 ft (3658 mm) Case
X-9
X-6
X-3
.
.
WWW
HUSSMANN
COM

Advertisement

Table of Contents
loading

Table of Contents