Timer Replacement / Piston Assembly Replacement; Meter Assembly Replacement (For Models Manufactured After Valve Serial # Date Of November 2015) - Canature WaterGroup HT 565BM-75 Owner's Manual

Table of Contents

Advertisement

PISTON AND/OR BRINE VALVE ASSEMBLY REPLACEMENT
Remove 3 X
Screws
1. Follow steps 1 to 6 of timer /Powerhead
replacement.
2. Remove three screws from the plate on the
valve body.
METER ASSEMBLY REPLACEMENT
1.
2.
1. Disconnect the meter cable from the meter.
2. Disconnect the valve from bypass by removing clips
3. Remove the coupling adapter from the valve
26
Plate
Brine Valve
Assembly
3. Remove the plate from the valve body and pull the
Piston Assembly from the valve. The brine valve
assembly can also be removed in this stage.
4. Remove the seal spacer assembly, grease it
with silicone lubricant and put back in.
Meter Cable
2X Clips
3.
Piston
Assembly
5. Replace piston assembly followed by timer assembly.
6. Replace the piston assembly and reverse
following steps in this section
4. Remove the meter support and then the impeller out from the coupling and
clean it
5. Replace meter with the help of special tool and re-assemble the
removed components back in the section
Seal and
Spacer

Advertisement

Table of Contents
loading

Table of Contents