Toe Kick Installation - Fisher & Paykel PROFESSIONAL RGV3-488 Installation Manual

Hide thumbs Also See for PROFESSIONAL RGV3-488:
Table of Contents

Advertisement

TOE KICK INSTALLATION

1
Long hem edge
FRONT VIEW
2
CROSS SECTION PROFILE VIEW
3
16
Insert both foot covers into
the toe kick ensuring the long
hem edge is facing the inside of
the product.
Align the toe kick with side
panels of the range.
Clip into place by rotating and
pushing the bracket down over
the range structure.
Check toe kick is flush with the
range and secure using 2 screws.
LEVELLING THE RANGE
1
PROFILE VIEW
2
PROFILE VIEW
PRIOR TO FINAL POSITIONING
Ensure the doors and toe kick panel are securely in place, if removed previously.
z
Ensure any backguard is fitted prior to final positioning. Refer to page 12 for all
z
backguard options.
Ensure all electrical and gas connections have been done as per instructions.
z
Ensure flooring and adjacent cabinetry are also level. To achieve a flush fit of the range to
z
adjoining countertops, it will be necessary to have level cabinets (front to back, and left to
right across opening of the range).
To expose both front feet,
slide the interlocking foot
covers out of the way.
Turn feet to adjust the height.
Replace both sets of covers,
ensuring each set locks together.

Advertisement

Table of Contents
loading

Table of Contents