P/N 0395730F
Installing Trim on Optional Stainless Steel
Splashguard
A trim piece is installed when joining optional
stainless steel splashguards. Use slotted screws
provided.
Screws
Splash-guard
Splash-guard Trim
Splash-guard
HUSSMANN CORPORATION, BRIDGETON, MO 63044-2483 U.S.A.

SEALING SPLASHGUARD TO FLOOR

I
by local sanitation codes, or if
F REQUIRED
desired by the customer,
guards may be sealed to the floor using a vinyl
cove base trim. The size of trim needed will
depend on how much the floor is out of level.
To install the trim to the splashguard:
1. Remove all dirt, wax and grease from the area
of the splashguard where adhesion will be
necessary. This is to ensure a good and secure
installation.
2. Apply a good contact cement to the cove trim
and allow proper drying time according to the
directions supplied with the cement.
3. Install the trim to the splashguard so that it is
lying flush with the floor. D
TRIM TO THE FLOOR
4. If required by local health codes the Cove
Trim may be sealed to the floor, using a
silicone-type sealer. Sealant must be removed
and replaced when servicing.
Cove Trim
Splash-guard
tainless steel splash-
S
O NOT SEAL THE
.
Cement
Low Temperature
3-3