Installing The Switch In The Server Chassis - Cisco Catalyst 3032 Getting Started Manual

Cisco systems catalyst blade switch getting started guide
Hide thumbs Also See for Catalyst 3032:
Table of Contents

Advertisement

Cisco Catalyst Blade Switch 3130 for Dell and Cisco Catalyst Blade Switch 3032 for Dell Getting Started Guide

Installing the Switch in the Server Chassis

Warning
Warning
Warning
Installing the Switch in the Server Chassis
Cisco Catalyst Blade Switch 3130 for Dell and Cisco Catalyst Blade Switch 3032 for Dell Getting Started Guide
8
Ultimate disposal of this product should be handled according to all national
laws and regulations. Statement 1040
For connections outside the building where the equipment is installed, the
following ports must be connected through an approved network termination
unit with integral circuit protection: 10/100/1000 Ethernet. Statement 1044
Installation of the equipment must comply with local and national electrical
codes. Statement 1074
Before you install the switch in the server chassis, consider these points:
Review and become familiar with the safety and handling guidelines
specified in the Product Information Guide.
Review the Regulatory Compliance and Safety Information for the Cisco
Catalyst Blade Switch 3000 Series for Dell that ships with this product.
If you plan to create a switch stack, review the
Switch Stack (Only 3130G-S and 3130X-S Switches)" section on page 22
before you install the switch and run the initial configuration setup program.
To help ensure proper cooling and system reliability, keep these points
in mind:
Each chassis I/O module bay must contain either a module or an
input/output module (IOM) blank.
When you remove a hot-swap module, you must replace it with an
identical module or an IOM blank within 1 minute of removal.
"Planning and Creating a
OL-14317-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 3130

Table of Contents