Cisco 7500 Series Configuration Manual page 139

Cisco systems bridge/router installation and configuration guide
Hide thumbs Also See for 7500 Series:
Table of Contents

Advertisement

Chapter 3
Installing a Cisco 7500 Series Router
R E V I E W D R A F T — C I S C O C O N F I D E N T I A L
Figure 3-15
Follow these steps to install the Cisco 7513, Cisco 7513-MX, and Cisco 7576:
Step 1
Remove all power supplies. (See the
Supplies" section on page
cage assembly in the following step. Ensure that both power supply bays are empty.
Remove the card cage assembly. (See the
Step 2
We recommend that you remove the card cage assembly to make the chassis easier to move; but this is
not required.
Note
Warning
To prevent injury, avoid sudden twists or moves. To prevent damaging the air intake vent below the
card cage opening, do not grasp the chassis below the air intake vent.
Step 3
Two people are required to lift the chassis. Standing on each side of the chassis, grasp the side handle
with one hand and with the other hand, grasp the chassis underneath the lower edge and lift with both
hands. Slowly lift the chassis in unison. (Remember to place the chassis in a location where the air intake
vent is not drawing in exhaust air from other equipment.)
Ensure that you temporarily have at least 2 to 3 feet (0.6 to 0.9 m) of clearance around the rear of the
chassis. You will need this space to install the power supplies, perform maintenance on the chassis, and
observe LED indications. After installation, this space can be reduced as required; however, maintain a
minimum of 19 inches (48.3 cm) behind the chassis.
OL-5008-03 B0
Lifting a Cisco 7513, Cisco 7513-MX, or Cisco 7576
POWER
A
7-3.) Both power supply bays must be empty if you plan to remove the card
To mount the router in a rack, refer to the publication Cisco 7513 and Cisco 7576 Rack-Mount
Kit Installation Instructions (Document Number 78-1058-xx), which shipped with the
rack-mount kit ACS-7000RMK=. This document is also used with the Cisco 7513-MX.
We do not recommend that you install the Cisco 7513, Cisco 7513-MX, or Cisco 7576 anywhere
other than in a rack.
Installing the Cisco 7513, Cisco 7513-MX, and Cisco 7576
POWER
B
"Removing Cisco 7513, Cisco 7513-MX, and Cisco 7576 Power
"Removing the Card Cage Assembly" section on page
Cisco 7500 Series Installation and Configuration Guide
7-5.)
3-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

750775137505

Table of Contents