Panasonic CS-C9BKNG Service Manual page 50

Table of Contents

Advertisement

Procedure:
1. Connect the vacuum pump to the charge set's centre hose.
2. Evacuation for approximately one hour.
- Confirm that the gauge needle has moved toward -0.1 MPa (-
76 cmHg) [vacuum of 4 mmHg or less.]
3. Close the valve (Low side) on the charge set, turn off the vacuum
pump, and confirm that the gauge needle does not move
(approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
- Vacuum pump oil
If the vacuum pump oil becomes dirty or depleted, replenish
as needed.
11.1.6. Gas charging
(After Evacuation)
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-c9bkn5gCs-c12bkngCu-c12bkn5g

Table of Contents