Connect The Cable To The Outdoor Unit - Panasonic CS-C9BKNG Service Manual

Table of Contents

Advertisement

4(A). Checking gas leakage for the left piping.
Connect the manifold gauge to the service
(1) *
port of 3-way valve.
Measure the pressure.
*
Keep it for 5-10 minutes.
(2) *
Ensure that the pressure indicated on the
gauge is the same as that of measured
*
during the first time.

10.3.5. CONNECT THE CABLE TO THE OUTDOOR UNIT

(FOR DETAIL REFER TO WIRING DIAGRAM AT UNIT)
1. Remove the control board cover from the unit by loosening the
screw.
2. Connecting cable between indoor unit and outdoor unit shall be
approved polychloroprene sheathed 4 × 1.5 mm
type designation 245 IEC 57 or heavier cord.
39
flexible cord,
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-c9bkn5gCs-c12bkngCu-c12bkn5g

Table of Contents