Vertical Termination - Empire Comfort Systems MILLIVOLT DVD32FP30N-3 Installation Instructions Manual

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for MILLIVOLT DVD32FP30N-3:
Table of Contents

Advertisement

Locate and mark the center point of the vent pipe using a nail on
the underside of the roof. Drive the nail through the center point.
Mark the outline of the roof hole around this center point.
NOTICE: Size of the roof hole dimensions depend on the pitch of
the roof. There must be a 1 inch clearance (25 mm) to the vertical
pipe sections. This clearance is to all combustible material.
Cover the opening of the vent pipe and cut and frame the roof hole.
Use framing lumber the same size as the roof rafters and install the
frame securely. Flashing anchored to frame must withstand high
winds. The storm collar is placed over this joint to make a water-tight
seal. Non-hardening sealant should be used to completely seal this
flashing installation.
Determining Minimum Vent Height Above the Roof.
WARNING: Major U.S. building codes specify minimum chimney
and/or vent height above the roof top. These minimum heights
are necessary in the interest of safety. These specifications are
summarized in Figures 47a and 47B.
rooF pitcH
Flat to 6/12
6/12 to 7/12
Over 7/12 to 8/12
Over 8/12 to 16/12
Over 16/12 to 21/12
Figure 47a
Note that for steep roof pitches, the vent height must be increased.
In high wind conditions, nearby trees, adjoining roof lines, steep
pitched roofs, and other similar factors can result in poor draft, or
down-drafting. In these cases, increasing the vent height may solve
this problem.
24" MIN.
(609.6mm)
24" MIN.
(609.6mm)
Figure 47B
When terminating the vent cap near an exterior wall or overhang,
maintain minimum clearances as shown in Figure 47B.
Page 30

Vertical terMiNatioN

H (Min.)
12" (305 mm)
15" (381 mm)
18" (457 mm)
24" (610 mm)
36" (914 mm)
12" MIN.
(304.8mm)
General Maintenance
Conduct an inspection of the venting system semi-annually.
Recommended areas to inspect are as follows:
1. Check areas of the venting system which are exposed to the
elements for corrosion. These will appear as rust spots or
streaks and, in extreme cases, holes. These components should
immediately be replaced.
2. Remove the cap and shine a flashlight down the vent. Remove
any bird nests or other foreign material.
3. Check for evidence of excessive condensate, such as water
droplets forming in the inner liner and subsequently dripping
out at joints. Condensate can cause corrosion of caps, pipe and
fittings. It may be caused by having excessive lateral runs, too
many elbows and exterior portions of the system being exposed
to cold weather.
4. Inspect joints to verify that no pipe sections or fittings have been
disturbed and, consequently, loosened. Also, check mechanical
supports, such as wall straps or plumbers' tape for rigidity.
Venting terminal shall not be recessed into a wall or siding.
A removable panel or other means must be provided in the enclosure
for visual inspection of the flue connection.
NOTICE: This also pertains to vertical vent systems installed on
the outside of the building.
Slide the vertical vent cap over the ends of the vent pipe and secure.
see Figure 48.
installing the Vent system in a chase
A chase is a vertical box-like structure built to enclose the gas
appliance and/or it's vent system. Vertical vent runs on the outside of
a building may be, but are not required to be installed inside a chase.
CAUTION: Treatment of firestop spacers and construction of
the chase may vary with the type of building. These instructions
are not substitutes for the requirements of local building
codes. Therefore, your local building codes must be checked
to determine the requirements for these steps.
NOTICE: When installing this vent system in a chase, it is always
good building practice to insulate the chase as you would the outside
walls of your home. This is especially important for cold climate
installations. Upon completion of building your chase framing,
install the vent system by following the instructions in this manual.
Remember to build the chase large enough so that minimum
clearance of combustible materials (including insulation) to the vent
system are maintained.