Download Print this page

Installation - Kohler ADAIR K- 5171T-ITSE Installation Instruction

4.2l skirted class five+ one-piece toilet+ cl

Advertisement

411
Finished Wall

INSTALLATION

TO REMOVE EXISTING TOILET
Turn off the water supply. Flush the toilet, and use a sponge
to remove the remaining water from the tank and bowl.
Disconnect the supply shut-off valve (if present), and remove
the old tank and bowl.
Remove the old gasket from the floor
and the closet flange with a putty knife.
Remove the old T-bolts and discard
them.
NOTICE:
if the new toilet is not
installed immediately, temporarily stuff
a rag into the closet flange.
NOTICE: Do not use white cement or high lime content
cements to install this toilet. The expansion of cement due to
a rise in temperature may make the toilet crack or cause
damage. Kohler is not responsible for any damage caused by
installation with the use of cement.
TO INSTALL SUPPLY
SHUT-OFF VALVE
Install the supply shut-off valve so it is
200mm above the finished floor line,
and 160mm to the left of the closet
flange centerline.
The centerline of the supply shut-off
valve outlet should extend 67mm from
the finished wall. Install the supply
shut-off valve with the outlet vertical.
1423356-T01-B
K-4983T-ITSE/K-4983T-ITNS
140
720
C
L
400
OF OUTLET
Kohler reserves the right to change marked dimensions without prior notice.
200
305/400
Supply
389
Fig.#1
160
1
Fig.#2
Closet Flange
2
Supply Shut-Off Valve
160
Closet Flange
Centerline
Fig.#3
3
-3-
FRONT OF BOWL
706
(
)
200mm
160
mm
T
67mm;

Advertisement

loading