Chapter 2: Install The System In The Rack; Unpack The System; Install The Rack Brackets; Shelf Brackets And Cable Management Assembly - Dell DD9500 Manual

Table of Contents

Advertisement

Topics:

Unpack the system

Install the rack brackets

Install the DD9500 system into a rack
Mount the cable management assembly
Installing the expansion shelves into the racks
Unpack the system
1. Remove the accessories and rail mount kit from the shipping packages.
2. Remove the controller and the bezels from the shipping packages.
NOTE:
For field installations, the controller has temporary handles pre-fitted at the factory to help in removal of the
system from the box and for placing it in a rack. While the controller is being placed in a rack, the handles attached to
the chassis can be removed by loosening the thumbscrew on each handle. The handles must be saved for future use.
CAUTION:
Data Domain systems are heavy. Always use two people or a mechanical lift to move a system. The
chassis displays warning labels.
Figure 4. Warning about lifting the system
3. Remove expansion shelves and their bezels from the shipping packages.
Install the rack brackets
Data Domain systems are installed into racks using the rail bracket hardware.

Shelf brackets and cable management assembly

The rack mounting kits are compatible with racks that have front-to-rear post spacing between 24 inches and 36 inches. The
hardware fits the following types of mounting holes:
● 7.1 mm round holes
● .375 inch / 9.2 mm square holes
● M5, M6, 12-24, and 10-32 threaded holes
The controller rail kit includes the following items:
Install the System in the Rack
Install the System in the Rack
2
13

Advertisement

Table of Contents
loading

Table of Contents