Grounding The Access Point - Cisco Aironet 1520 Series Hardware Installation Manual

Outdoor mesh access point
Hide thumbs Also See for Aironet 1520 Series:
Table of Contents

Advertisement

Mounting the Access Point
R E V I E W D R A F T — C I S C O C O N F I D E N T I A L
Position the two bolts on the access point into the quick mount notches on each side of the mounting
Step 4
bracket (see
Figure 2-8
Screw a M8 x16 bolt (with flat and lock washers) into the second bolt hole on each side of the access
Step 5
point.
Ensure that the front of the access point is vertical, and tighten the four bolts to 13 to 15 ft lbs
Step 6
(17.6 to 20.3 Nm).
(Optional) When using the optional Cisco external omnidirectional antennas, connect them to the access
Step 7
point as shown in
Note
Continue with the
Step 8
Point" section on page
Cisco Aironet 1520 Series Outdoor Mesh Access Point Hardware Installation Guide
2-20
Figure
2-8). Ensure that the hinged door is facing out.
Access Point Hanging in Mounting Bracket
Figure
2-2. Hand-tighten the antennas to the access point.
Some access point configurations might support two or three of the 2.4-GHz antennas.
"Grounding the Access Point" section on page 2-46
2-50.
Chapter 2
Mounting Instructions
and the
"Powering the Access
OL-12632-03

Advertisement

Table of Contents
loading

Table of Contents