Samsung AM280FNHDEH Installation Manual page 22

Hide thumbs Also See for AM280FNHDEH:
Table of Contents

Advertisement

Wiring Work (Continued)
How to connect your extended power cables
1.
Prepare the following tools.
Tools
Spec
Shape
2.
As shown in the figure, peel off the shields from the rubber and wire of the power
cable.
- Peel off 20 mm of cable shields from the pre-installed tube.
• For information about the power cable specifications for indoor and
outdoor units, refer to the installation manual.
CAUTION
• After peeling off cable wires from the pre-installed tube, insert a
contraction tube.
3.
f Method 1
f
Push the core wire into the sleeve from both sides.
f Method 2
f
Twist the wire cores together and push it into the sleeve.
4.
Using a crimping tool, compress the two points and flip it over and compress another two points in the same location.
- The compression dimension should be 8.0.
- After compressing it, pull both sides of the wire to make sure it is firmly pressed.
22
Connection sleeve
Crimping pliers
(mm)
MH-14
20xØ6.5(HxOD)
f Method 1
f
Compression
dimension
Insulation tape
Width 19mm
f Method 2
Compress it 4 times.
5 mm
Contraction tube
(mm)
70xØ8.0(LxOD)
Power cable
20
20
20
60
120
180
(Unit: mm)
20
Pre-installed tube for the power cable
Connection sleeve
Connection sleeve
f
Compress it 4 times.
5 mm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am fnhdeh series

Table of Contents