JUKI IP-100A Engineer's Manual page 104

Computer-controlled, direct-drive, high-speed, 1-needle, lockstitch, zigzag stitching machine
Table of Contents

Advertisement

Select the method to perform communication and press set key switch 8
Reference : Communication method cannot be selected by downloading of program.
3 Data communication source 3
4 Data communication destination 5
Set data communication source 3 and data communication destination 5 in the ten key screen, or "+"
or "-" key.
(Ten key input, or "+" or "-" key input is changed according to the kind of data.)
2. Start of communication
After all settings have been completed, press communication start key switch 8
When the screen returns to the communication setting screen after display of the during communication screen,
communication is completed.
However, It is necessary to turn OFF the power after ending the communication of all sewing machine data or
program data.
(Caution) Never turn OFF the power during communication.
In case of OFF, operation cannot be guaranteed.
100
.
to start communication.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lz-2290a seriesIp-100dSc-915Sc-916

Table of Contents