Installation - Wells BWB1SE Owner's Manual

Belgian waffle baker
Hide thumbs Also See for BWB1SE:
Table of Contents

Advertisement

INSTALLATION

NOTE: DO NOT discard
the carton or other packing
materials until you have
inspected the appliance for
hidden damage and tested it
for proper operation.
Refer to SHIPPING DAMAGE
CLAIM PROCEDURE on the
inside front cover of this
manual.
CAUTION:
RISK OF
DAMAGE
DO NOT connect or energize
this appliance until all
installation instructions are
read and followed. Damage
to the appliance will result
if these instructions are not
followed.
CAUTION:
ELECTRICAL
SHOCK
HAZARD
The ground prong of the
power cord is part of a system
designed to protect you from
electric shock in the event of
internal damage to the
appliance.
NEVER CUT OFF THE
GROUND PRONG
(large round prong).
NEVER TWIST A PRONG TO
FIT AN EXISTING
RECEPTACLE.
Contact a licensed electrician
to install an electrical
receptacle appropriate to
the voltage and amperage
requirements of the
waffle baker.
IMPORTANT:
Damage due to being
connected to the wrong
voltage or phase is NOT
covered by warranty.
UNPACKING & INSPECTION
Carefully remove the appliance from the carton. Remove all protective
plastic film, packing materials and accessories from the appliance
before connecting performing any installation procedure.
Carefully read all instructions in this manual and the Installation
Instruction Sheet packed with the appliance before starting any
installation.
Read and understand all labels and diagrams attached to the
appliance.
Carefully account for all components and accessories before discarding
packing materials. Store all accessories in a convenient place for later
use.
COMPONENTS
1 ea.
DRIP TRAY
4 ea.
ADJUSTABLE FEET
SETUP
Setup the appliance only on a firm, level, non-combustible surface.
Verify local codes for requirements. Concrete, tile, terrazzo or metal
surfaces are recommended.
Install the provided adjustable feet, one on each corner of the
appliance, in the holes provided.Verify that the unit sits firmly on ALL
FOUR FEET. Adjust as required to level the appliance. All four feet
must be adjusted to firmly contact the countertop in order to prevent
tipping.
ELECTRICAL INSTALLATION
Refer to the nameplate. Verify the electrical service power. Voltage
and phase must match the nameplate specifications. Connecting the
waffle baker to the wrong voltage can severely damage the unit or
cause noticeably decreased performance.
This appliance requires a minimum of a 120V single phase 15 amp
circuit with a properly installed and grounded NEMA5-15P receptacle.
IMPORTANT: Damage due to being connected to the wrong voltage is
NOT covered by warranty.
SEASONING THE GRIDS
Lightly spray commercial waffle baker spray on both upper and lower
grid.
Carefully close the upper grid. Turn the power switch on, then allow the
waffle baker to pre-heat for at least 20 minutes.
Using the handle, lift the upper grid and lightly re-coat both upper and
lower grid. Lower the upper grid.
The appliance is now ready for use.
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bwb-1s

Table of Contents