Napoleon LHD50SSN Installation And Operating Instructions Manual page 34

Table of Contents

Advertisement

34
2"
1"
2"
LHDS(K,P,W)50
WARNING:
Non-combustible fi nishing material tight to the frame around the
project more than 1" from the face of the door (above the door and sides only). If greater projections
are needed, increase the clearance to the sides and top by 2" for every 1" projection.
If using LHDS(K,P,W)50 surround , then 2" clearance above the frame is required before projecting out
a maximum 2". If greater projections are needed, increase the clearance to the top by 2" for every 1"
of additional projection.
W415-0839 / C / 02.03.12
SIDE VIEW
SIDE
2"
VIEW
2"
1"
DOOR
2"
1"
DOOR
operating
door must not

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lhd50ssn2Lhd50sspLhd50pss2Lhd50ss

Table of Contents