LG AUUW096D Installation Manual page 22

Table of Contents

Advertisement

The Indoor Unit Installation
3. Convertible type(9k/12k Btu/h)
Open panel front
1. Remove the five screws.
2. Release the claws in the 3 places indicated.
3. Pull up the Front Panel.
Cover pipe and cover side remove
1. Pull up the side cover of desired connecting
direction, then cover side is separated.
2. Pick the pipe hole of the side cover.
CAUTION: After removing the
pipe hole, cut the burr for
safety.
When making pipe path through rear
NOTICE
wall, you don't need to pick the pipe
hole.
Drain hose junction
1. Remove the rubber stopple in the desired
drain direction.
2. Insert drain hose into the handle of drain pan,
and join drain hose and connecting hose
according to the figure by.
22
2
1
Claw
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents