INSTALLATION

INSTALLATION

7 UNPACKING THE PRODUCT

R
RBS 2S solar heaters are supplied in a single package on a
wooden pallet.
The insulation and the lining components of the models 800
and 1000 are supplied separately from the structural work and
are to be assembled upon receiving the product as described
in the paragraph "Assembly of the insulation and the lining
(models 800 - 1000)". For these models the magnesium anode
is supplied in a cardboard box.
The following items are delivered in a plastic bag inside the
packaging:
− Instruction manual
− Bar code label
− Hydraulic test certificate
− Energy label (to be applied to device upon installation)
− No. 4 adjustable feet to be mounted during installation
(for models 800 - 1000 only).
9
The instruction manual is an integral part of the solar stor-
age cylinder. Once located, read it thoroughly and keep it
safe.
9
For handling operations, thoroughly follow the instructions
on device package label.
8 ASSEMBLY OF THE INSULATION AND THE LINING
(MODELS 800 - 1000)
The assembly of the insulation and lining components must be
performed at the site of installation to facilitate passage through
any doors and/or entries to the room.
5
3
2
1
Proceed as follows:
− Fit the magnesium anode (6) with its seal in the sleeve
and fix it in place
− Assemble the insulating covers (1) around the body of
the heater, making sure that the engagement points on
the edges are positioned correctly. The edges are not re-
quired to be closed completely
− Place the front protection plate (3) correctly on the at-
tachments
− Place the washers on the attachments and the protec-
tion for the inspection flange (4)
− Place the rear protection plate by closing the interlock-
ing flaps (L) without closing completely (leave one tooth
open)
− Apply the upper insulation (2) and the upper cover (5) (in
order to insert the cover, exert a light and homogeneous
pressure)
1
3
L
L
1
3
4
6
− Close the interlocking flaps (L) completely, which were
previously left with an open tooth
− Fit the cover of the inspection flange using the two
self-tapping screws (7) provided
− Apply the technical data plate and serial number plate.
If disassembling is required, proceed in reverse order.
9
Wear suitable personal protective equipment and use suit-
able safety devices.

9 PLACE OF INSTALLATION

R
RBS 2S solar heaters can be installed in all rooms not re-
quiring a level of electrical protection of the device greater than
IP X0D.
NOTE: the above-indicated dimensions are recommended for a
correct maintenance and access to the device.
9.1
Installation in older systems and systems
requiring modernisation
3
When installing
systems requiring modernisation, always perform the following
checks.
− Make sure that the system is fitted with safety and con-
trol devices in accordance with applicable legislation and
standards
− Make sure that the central heating circuit has been
flushed out to remove all sludge and lime scale, and has
been vented and seal tested
7
− Make sure that a suitable water treatment system is in-
stalled if the quality of the supply/recirculation water so
demands (refer to the reference values listed in the table
alongside).

10 WATER QUALITY REQUIREMENTS

Electrical conductivity
Chlorine ions
Sulphuric acid ions
Total hardness
Sulphur ions
Ammonia ions
The values above ensure proper operation of the system. Refer
to the limit values specified in the current standards and regu-
lations on the installation site.
Installation
6
R
RBS 2S storage cylinders in old systems or
REFERENCE VALUES
pH
less than 200 μS/cm (25°C)
Total iron
Alkalinity M
Silicon ions
6-8
less than 50 ppm
less than 50 ppm
less than 0.3 ppm
less than 50 ppm
less than 35°F
none
none
less than 30 ppm

Advertisement

Table of Contents
loading

Table of Contents