Technical Assistance Service; Putting Into Service; Temporary Shutdown; Preparing For Extended Periods Of Disuse - Riello RBS 200 2S Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

TECHNICAL ASSISTANCE SERVICE

TECHNICAL ASSISTANCE SERVICE

12 PUTTING INTO SERVICE

It is essential to perform the following checks before starting up
or testing the functioning of the storage cylinder. In particular,
check that:
− The supply cocks in the domestic water circuit are all open
− The water connections to the boiler and solar collectors
have been made correctly
− All the pipes in the water circuit have been insulated in
conformity to relevant standards
− The solar collector circuit has been correctly flushed out
and filled with water-glycol mix, and all air has been
bled out of the circuit (see the manual for the solar col-
lectors)
− Start up the boiler (if installed) as instructed in its own
manual.
− Put the solar collectors into service. See the manuals for
the solar collectors and associated accessories.
Once the system has been started up, perform the following
checks.
− Make sure that all pumps are free and rotate in the right
direction
− Make sure that all circuits have been bled.
− Make sure that the boiler and solar collectors connect-
ed to the system shut down correctly when their mains
power switches are turned OFF .
Provided the above checks have been completed satisfactorily,
restart the system and verify its performance.

13 TEMPORARY SHUTDOWN

If you are going away for a short period of time like a weekend
or a short holiday, etc., and outdoor temperatures are going to
remain above ZERO, proceed as follows.
− Adjust the storage cylinder thermostat to its minimum
setting.
9
If the temperature to which the heater is exposed can fall
below 0°C (frost hazard), perform the operations described
in paragraph "Preparing for extended periods of disuse".

14 PREPARING FOR EXTENDED PERIODS OF DISUSE

If the storage cylinder is not going to be used for an extended
period of time, perform the following operations:
− Switch the electricity supply to the storage cylinder's
valve group and to any associated boiler OFF at the main
switch and at the control panel
− Close the shut-off cocks for the domestic hot water cir-
cuit.
9
Drain the central heating circuit and domestic hot water cir-
cuit if there is any risk of freezing.
Technical Assistance Service
8

Advertisement

Table of Contents
loading

Table of Contents