Heat & Glo NorthStar-BK Installation Manual page 18

Hide thumbs Also See for NorthStar-BK:
Table of Contents

Advertisement

I. Heat Zone Kit (Optional)
T e Heat- one a esso
e la e t ou
ai
u t s to e ote lo ations in t e
sa e oo
o ot e oo s o t e uil in
1 o 2 Heat- one its on t e
it MUST e e o
e
I an
a ts a e
issin o
eale
e o e sta tin installation DO NOT install a a -
a e
it
T is it is teste an sa e
it t is installation
anual It is ou es onsi ilit to
ea all inst u tions e o e sta tin installation an to ol-
lo t ese inst u tions a e ull
T e Heat- one
oo
it is a e ull en inee e an
ust e installe onl as s e i e
o its o
onents ou ill voi t e a ant an
ossi l
ause a
e a a
a o in to a
li a le lo al state
national o es
lan t e lo ation o t e
Figure 3.13 Minimum Clearances to Combustibles
18
Heat & Glo • NORTHSTAR • 480-2360 Installation Manual • Rev D • 05/30/13
All manuals and user guides at all-guides.com
it onve s a
ai
o
ou
a install
e la e Installation o t is
a uali e se vi e te
ni ian
a a e
onta t ou lo al
en installe in a o an e
u in installations
I
ou
o i
it o an
ou
Installation
ust e one
ovin ial an /o
e la e an
a
ai
u t un s
Possible Air Duct Runs / Locations
1 2 in. ( 30 5 m m ) m inim u m
f r o m
r e g is t e r t o c e il ing
W a l l R e g is t e r
T w o D u c t K it s
DUCT RUN REQUIREMENTS
t e
MA IM M Du t Run
MINIM M Du t Run
DUCTING MATERIAL
6 in 152
DO NOT u t into e istin
MINIMUM CLEARANCE TO COMBUSTIBLES
1 in 25
1/2 in 13
0 in 0
o
12 in 305
Re e to i u e 3 13
a
CAUTION! ALL wiring should be done by a qualified elec-
trician and shall be in compliance with local codes and
with the National Electric Code NFPA/NEC No.
CSC22.1 Canadian Electric Code.
c l e a r a nc e
C e il ing R e g is t e r
F l o o r R e g is t e r
40- t 12
36 in
14
- ent Onl
u na e lenu
o
t e - ent
o
to & otto
o outlet o
t e si es o outlet o
o
all e iste to eilin
C e il ing R e g is t e r
70-current.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Northstar-gtNorthstar-nt

Table of Contents