Download Print this page

Traction Motor Service - Toro Workman MDE 2008 Service Manual

Advertisement

Traction Motor Service

120 to 140 in- -lb
(13.6 to 15.8 N- -m)
12
11
10
1. Frame and field assembly
2. Armature
3. Brush lead (2 used)
4. Cap screw (2 used per brush lead)
5. Cap screw (4 used)
Disassembly (Fig. 56)
1. Unlatch and slide headband from traction motor.
2. Pull back the brush springs and latch them in the
open position on the spring holders. Slide brushes from
the brush holders.
3. Use an arbor press or a bearing puller to remove the
armature from the commutator end head and frame and
field assembly (Fig. 57).
4. Remove four (4) bolts that secure the commutator
end head to the frame and field assembly. Remove com-
mutator end head from frame and field assembly.
Electrical System
15
14
13
9
6. Cap screw (8 used)
7. Brush (8 used)
8. High temperature sensor
9. Headband
10. Bolt (4 used)
5
6
7
8
Figure 56
5. Remove the retaining ring and press bearing from
the commutator end head. Discard the bearing.
When using compressed air for cleaning motor
components, follow all safety instructions, in-
cluding wearing eye and respiratory protection.
6. Carefully blow out any accumulated carbon dust and
dirt from the commutator end head and the frame and
field assembly using clean, oil free, compressed air.
Page 3 - - 38
3
2
4
18 to 22 in- -lb
(2.0 to 2.5 N- -m)
11. Commutator end head
12. Bearing
13. Retaining ring
14. Brush spring (8 used)
15. Brush box
CAUTION
1
Workman MDE

Advertisement

loading

This manual is also suitable for:

Workman mde 2011