HSR Associates, Inc.
100 Milwaukee Street
La Crosse, Wisconsin 54603
608.784.1830
fax 608.782.5844
To (Company):
Market and Johnson
Attention:
Craig Namyst
Project:
WTC Admin HVAC & Lighting; BP#2
Date Received:
May 16, 2017
Date Returned:
May 17, 2017
CONTRACTOR PLEASE NOTE:
Reviewing is only for conformance with the design concept of the Project and compliance with the information given in the
Contract Documents. The Contractor is responsible for dimensions to be confirmed and correlated at the site for information
that pertains solely to the fabrication process or to the means, methods, techniques, sequences and procedures of
construction and for coordination of the Work of all trades. Corrections or comments made on this Shop Drawing submittal do
not relieve Contractor from compliance with requirements of Contract Documents.
X Review Completed
Exceptions as Noted
Comments:
23 05 13 MOTORS
1. Review completed. VFDs are good to go.
Review Comments
Trade:
From:
HSR Project No.:
Qty. Received:
Qty. Returned:
Rejected as Noted
Revise and Resubmit
Shop Drawing
HVAC
Jake Malphurs
17001
1 via email
1 via email
Additional Information
Required as Noted