Jacuzzi U961000 Installation And Operation Instructions Manual page 13

Espree bathtub series
Table of Contents

Advertisement

Espree™ Bathtub Series
Electrical Connection 6060 w/Heater
On the 6060 with integral skirt, one junction box has
been provided for the pump/motor. The motor is bonded
to the junction box at the factory. To access, remove skirt
access panel.
A separate 120 VAVAC, 15 AMP dedicated circuit
with GFCI protected outlet (commercially available) is
required for heater and is to be installed in a junction box.
The junction box is to be hard wired.
Follow the bonding instructions below:
X
X
With a #8 solid copper wire, bond the heater to the
house electrical panel or approved local bond. A
bonding lug is provided on the heater.
Initial Start-Up
X
X
Push the GFCI test button. The reset button should
pop out.
X
Y
Push this button in to reset. If the interrupter fails
to operate in this manner, there is a ground current
flowing or a device malfunction, indicating the
possibility of electrical shock.
X
Z
Turn off power and do not use the bath until the
source of the problem has been identified and
corrected.
GFCI
Bonding to
(Commercially Available)
RapidHeat™
J-Box
(Commercially Available)
Installation and Operation
6060 Corner Unit
For Heater
GFCI
J-Box
(Commercially Available)
Overheat
Protection
Press to Reset
Power Cord
www.jacuzzi.com
Bonding to
Pump/Motor
Power Cord
Heater ON
Bonding
For Pump/Motor
Page 13

Advertisement

Table of Contents
loading

Table of Contents