Step 14 Performing Final Check And Trial Operation - Samsung AC BXADCH Series Installation Manual

Hide thumbs Also See for AC BXADCH Series:
Table of Contents

Advertisement

2 Connect the flexible hose to the flexible hose port.
• In damp hard soil rather than loose sandy or
gravel soil that has a higher earthing resistance.
• Away from underground structures or facilities,
such as gas pipes, water pipes, telephone lines
and underground cables.
• At least two metres away from a lightening
conductor earthing electrode and its cable.
NOTE
• The earthing wire for the telephone line cannot be
used to ground the air conditioner.
Carbon plastic
To grounding screw
19.69inch(50cm)
11.81inch
(30cm)
3 Finish wrapping insulating tape around the rest of the
pipes leading to the outdoor unit.
4 Install a green/yellow coloured earthing wire:
• If the earthing wire is too short, connect an
extension lead in a mechanical way and wrap it
with insulating tape (do not bury the connection).
• Secure the earthing wire in position with staples.
NOTE
• If the earthing electrode is installed in an area with
heavy traffic, its wire must be connected securely.
5 Carefully check the installation by measuring the
earthing resistance with a earth resistance tester. If
the resistance is above the required level, drive the
electrode deeper into the ground or increase the
number of earthing electrodes.
6 Connect the earthing wire to the electrical component
box inside of the outdoor unit.
DB68-11274A-00_IM_CAC Universal Outdoor_AA_EN.indd 27
DB68-11274A-00_IM_CAC Universal Outdoor_AA_EN.indd 27
Step 14 Performing final check and
trial operation
1 Check the power supply between the outdoor unit and
the auxiliary circuit breaker.
• 1 phase power supply : L, N
2 Check the indoor unit.
a Check that you have connected the power and
communication cables correctly. (If the power
cable and communication cables one mixed up or
connected incorrectly, the PCB will be damaged.)
b Check that the thermistor sensor, drain pump/
Steel core
hose, and display are connected correctly.
Terminal M4
3 Press K1 or K2 on the outdoor unit PCB to run the test
PVC-insulated
green/yellow
mode and stop.
wire
Key
Push type
K1
Short
K2
Short
K3
Short
Display
Mode
SEG 1 SEG 2 SEG 3 SEG 4
1st
Heating test mode
Defrost test
2nd
¹⁾
mode
3rd
End Key operation
Cooling test
1st
mode
2nd
Inverter check
3rd
Pump down
4th
Unuesal
Inverter Fault
5th
Detection
²⁾
(Comp#1)
Auto trial
6th
operation
³⁾
Auto check
(Installtion
7th
commissioning
mode)
End Key
8th
operation
Reset
1st
Release Eco
mode
27
English
2021-09-14 오전 9:22:01
2021-09-14 오전 9:22:01