Performing Final Check And Trial Operation - Samsung Am NN1 Series Installation Manual

Hide thumbs Also See for Am NN1 Series:
Table of Contents

Advertisement

Performing final check and trial operation

To complete the installation, perform the following checks and tests to ensure that the air conditioner operates
correctly.
1 Check the followings.
Strength of the installation site
Tightness of pipe connection to detect a gas leak
Electric wiring connections
Heat-resistant insulation of the pipe
Drainage
Earth conductor connection
Correct operation (follow the steps below)
After finishing the installation of the air conditioner, you should explain the following to the user. Refer to appropriate
pages in the User's Manual.
1 How to start and stop the air conditioner
2 How to select the modes and functions
3 How to adjust the temperature and fan speed
4 How to adjust the airflow direction
5 How to set the timers
6 How to clean and replace the filters
NOTE
When you complete the installation successfully, hand over the User's Manual and this Installation Manual to the
user for storage in a handy and safe place.
37
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am028nn1deh/tl

Table of Contents