Concealed Unit Installation

Location

The unit must be installed in a place that complies with the following requirements:
Note: Keep the unit at a distance of at least 1 meter away from TV sets and radios to
Clearance for maintenance procedures
Hanging rods installation (4)
Note: Confirm that minimum draining pitch is of 1/100 or more.
MS-SVN056C-EN
Full clearance for installation and maintenance procedures
Unobstructed inlets and outlets and also free of outdoor air currents
Appropriate capacity to allow the flow of air to reach the space designated for air conditioning
Easy removal of all connecting and draining piping
Space devoid of radiation and heat sources
avoid interference from sound and images coming from these devices.
Consult the following diagrams to determine the distance in between hanging rods. Use
threaded rods of 10mm dia. / 0.394 in.
Hanging ceiling rods/supports will vary according to each individual construction. Always
maintain supports/rods perfectly leveled and reinforce them with wedges in order to prevent
vibrations.
Cut hanging supports/rods as deemed necessary and reinforce the cutting points.
Install piping system after installing the body of the unit. Determine the direction of the piping
with outlet towards the outside of the suspended ceiling. Before installing the machine,
determine connecting points for refrigerant lines, drain piping, and indoor and outdoor unit
lines.
Concealed Unit Installation