ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service information
pack upon completion of work.
These instructions do not cover all variations in
systems nor provide for every possible contingency to
be met in connection with installation. All phases of
this installation must comply with NATIONAL, STATE
AND LOCAL CODES. Should further information be
desired or should particular problems arise which are not
covered sufficiently for the purchaser's purposes, the matter
should be referred to your installing dealer or local distributor.
A. GENERAL
The following instructions cover 2TTA0030,040,050 & 060AD
Condensing Units.
NOTE:
These outdoor units may be used with indoor units
equipped with Thermostatic Expansion Valve or Accutron™
Flow Control Check Valve (F.C.C.V.) assembly for refrigerant
flow control only.
Check for transportation damage after unit is uncrated.
Report promptly, to the carrier, any damage found to the unit.
To determine the electrical power requirements of the unit,
refer to the nameplate of the unit. The electrical power
available must agree with that listed on the nameplate.
B. LOCATION & PREPARATION OF THE
UNIT
1. When removing unit from the pallet, notice the tabs on
the basepan. Remove tabs by cutting with a sharp tool as
shown in Figure 2 (see page 2).
2. The unit should be set on a level support pad at least as
large as the unit base pan, such as a concrete slab. If this
is not the application used please refer to application
bulletin SSC-APG002-EN.
3. The support pad must NOT be in direct contact with
any structure. Unit must be positioned a minimum of
12" from any wall or surrounding shrubbery to insure
adequate airflow. Clearance must be provided in front
of control box (access panels) & any other side requir-
ing service access to meet National Electrical Code.
Also, the unit location must be far enough away from
any structure to prevent excess roof run-off water from
pouring directly on the unit. Do not locate unit(s) close
to bedroom(s).
4. The top discharge area must be unrestricted for at least
five (5) feet above the unit.
Installer's Guide
Condensing Units
2TTA0030,040,050 & 060AD000A
1
5. When the outdoor unit is mounted on a roof, be sure the
roof will support the unit's weight. Properly selected
isolation is recommended to prevent sound or vibration
transmission to the building structure.
6. The maximum length of refrigerant lines from outdoor to
indoor unit should NOT exceed sixty (60) feet.
7. If outdoor unit is mounted above the air handler,
maximum lift should not exceed sixty (60) feet (suction
line). If air handler is mounted above condensing
unit, maximum lift should not exceed sixty (60) feet
(liquid line).
NOTE:
Refer to "Refrigerant Piping Software" Pub. No. 32-3312-02.
8. Locate and install indoor coil or air handler in accor-
dance with instruction included with that unit.
18-AC51D5-5
5 FT. ABOVE UNIT-UNRESTRICTED

Advertisement

Table of Contents
loading

Summary of Contents for Trane 2TTA0030

  • Page 1 A. GENERAL The following instructions cover 2TTA0030,040,050 & 060AD Condensing Units. NOTE: These outdoor units may be used with indoor units equipped with Thermostatic Expansion Valve or Accutron™...
  • Page 2: Installing Refrigerant Lines

    CHECK VALVE (F.C.C.V.) ORIFICE 2. Consider types of bends to be made and space limitations. BODY NOTE: Large diameter tubing will be very difficult to rebend once it AS SHIPPED has been shaped. FIELD SUPPLIED LIQUID LINE 18-AC51D5-5 © 2010 Trane...
  • Page 3 Installer’s Guide LIQUID LINE SERVICE VALVE GAS LINE SERVICE VALVE 3. Cut and fit tubing, minimizing the use of sharp 90° bends. connecting branch hose to a cylinder of HCFC-22 and vacuum pump. 4. Insulate the entire gas line and its fittings. 5.
  • Page 4: Troubleshooting

    Installer’s Guide 9. The liquid line shut-off valve can now be opened. Remove H. OPERATIONAL AND CHECKOUT shut-off valve cap. Fully insert hex wrench into the stem PROCEDURES and backout counterclockwise until valve stem just touches Final phases of this installation are the unit Operational and rolled edge (approximately five [5] turns) observing Checkout Procedures which are found in this instruction (see WARNING statement on page 2.
  • Page 5 Installer’s Guide TYPICAL FIELD HOOK-UP DIAGRAMS FOR 2TTA0030-060AD PRINTED FROM B152901 P02 NOTE NOTE PRINTED FROM B152903 P02 W2 present only on 2 stage thermostat and furnace PRINTED FROM B152907 P04 W2 present only on 2 stage thermostat and furnace...
  • Page 6 Installer’s Guide 2TTA030,040,050 & 060AD OUTLINE DRAWING Note: All dimensions are in MM (Inches). MODELS BASE FIG. 2TTA0030AD 730 (28-3/4) 724 (28-1/2) 651(25-5/8) 3/8 137 (5-3/8) 65 (2-5/8) 210 (8-1/4) 57 (2-1/4) 457 (18) 2TTA0040AD 730 (28-3/4) 724 (28-1/2) 651(25-5/8) 1-1/8 3/8 137 (5-3/8) 65 (2-5/8) 210 (8-1/4) 57 (2-1/4) 457 (18) 2TTA0050AD 832 (32-3/4) 829 (32-5/8) 756 (29-3/4) 1-1/8 3/8 143 (5-5/8) 92 (3-5/8) 210 (8-1/4) 79 (3-1/8) 508 (20) 2TTA0060AD...
  • Page 7: Mounting Hole Location

    Installer’s Guide MOUNTING HOLE LOCATION Note: All dimensions are in MM (Inches). NOTE: For model base size, see table on page 6. From Dwg. 21D152989 Rev. 0 18-AC51D5-5...
  • Page 8: Checkout Procedure

    2 Check only necessary if heating unit is used for indoor section and wiring has been disturbed during installation of cooling equipment. 3 When applicable. 01/10 Trane www.trane.com Trane has a policy of continuous product and product data improvement and it reserves the right to change design and specifications without notice.

This manual is also suitable for:

2tta00402tta0050060ad000a

Table of Contents