3.8
Installing the shock absorber
Main work
–
Check throttle cable routing.
The throttle cable must be routed behind the handle-
bar, on the right of the frame, and to the carburetor. The
throttle cable must be secured behind the fuel tank con-
tact area rubber band.
»
If the throttle cable routing is not as specified:
–
Correct throttle cable routing.
E00779-01
Finishing work
–
Install the fuel tank. (
–
Mount the seat. (
Main work
–
Push splash protector
absorber. Mount and tighten screw
Guideline
Screw, top
shock absorber
–
Mount and tighten screw
Guideline
V00344-11
Screw, bottom
shock absorber
Info
The heim joint for the shock absorber at the swingarm
is Teflon-coated. It must not be greased with grease or
with other lubricants. Lubricants dissolve the Teflon
coating, thereby drastically reducing the service life.
Finishing work
–
Remove the motorcycle from the lift stand. (
p. 13)
p. 12)
1
to the side and position the shock
2
.
M12
80 Nm (59 lbf ft)
Loctite
3
.
M12
80 Nm (59 lbf ft)
Loctite
p. 11)
3 WORK
®
2701™
®
2701™
15