Download Print this page

Goodman CPH COMMERCIAL SS-CPH90-150 User Manual page 25

7½- to 12½-ton self-contained packaged heat pump

Advertisement

u
C
nit
learanCeS
Maintain an adequate clearance around the unit for safety, service, maintenance, and proper unit
operation. Leave a total clearance of 75" on the main control panel side of the unit for possible removal
of fan shaft, coil, electric heat, and gas furnace. Leave a clearance of 48" on all other sides of the unit for
possible compressor removal or service access, and to ensure proper
ventilation and condenser airflow. Do not install the unit beneath
any obstruction. Install the unit away from all building
exhausts to inhibit ingestion of exhaust air into the unit's
fresh-air intake.
e
e
l
leCtriCal
ntranCe
oCationS
11⅝"
10
/
"
3
16
3"
SS-CPH90-150
48"
Dimples Mark Drill Locations
High-Voltage Entrance
Low-Voltage Entrance
www.goodmanmfg.com
36" Min.
75"
48"
P
S
roduCt
PeCifiCationS
48"
25

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Cph090 seriesCph120 seriesCph150 series