GENERAL INFORMATION
poWer Source and load lineS
The utility power supply lines, the standby (genera-
tor) supply lines, and electrical load lines must all be
connected to the proper terminal lugs in the transfer
switch. The following rules apply: In 1-phase systems
with a 2-pole transfer switch, connect the two utility
source hot lines to Transfer Switch Terminal Lugs N1
and N2. Connect the standby source hot lines (E1,
E2) to Transfer Switch Terminal Lugs E1 and E2.
Connect the load lines from Transfer Switch Terminal
Lugs T1 and T2 to the electrical load circuit. Connect
UTILITY, STANDBY and LOAD neutral lines to the
neutral block in the transfer switch.
Part 1
natural GaS Fuel interconnectionS
SAFETY
0000001
SHUT OFF
VALVE
Figure 2. Proper Fuel Installation
SyStem control interconnectionS
Home standby generators are equipped with a termi-
nal board identified with the following terminals: (a)
UTILITY 1, (b) UTILITY 2, (c) 23, and (d) 15B. Load
centers house an identically marked terminal board.
When these four terminals are properly interconnect-
ed, dropout of utility source voltage below a preset
value will result in automatic generator startup and
transfer of electrical loads to the "Standby" source.
On restoration of utility source voltage above a preset
value will result in retransfer back to that source and
generator shutdown.
5-7" WC REGULATOR
TO HOUSEHOLD
GAS METER CAPABLE
OF PROVIDING NATURAL GAS
FUEL FLOW OF:
sEctioN 1.2
iNstallatioN Basics
140,000 (7 kW)
156,000 (9 kW)
215,000 (12 kW)
BTU/HOUR
220,000 (13 kW)
261,000 (16 kW)
294,000 (18 kW)
+HOUSEHOLD APPLIANCES
(BASED ON 1000 BTU/CU FT)
GAS MAIN
2-5 PSI