Care And Maintenance - Carrier 38BYC Installation And Start-Up Instructions Manual

12 seer split system heat pump
Table of Contents

Advertisement

NOTE: When charging is necessary during heating season,
charge must be weighed in accordance with unit rating plate ± 0.6
oz/ft of 3/8-in. liquid line above or below 15 ft respectively.
EXAMPLE:
To calculate additional charge required for a 25–ft line set:
25 ft – 15 ft = 10 ft X 0.6 oz/ft = 6 oz of additional charge
Step 15—Final Checks
IMPORTANT: Before leaving job, be sure to do the following:
1. Securely fasten all panels and covers.
2. Tighten service valve-stem caps to 1/12-turn past finger-tight.
Copyright 2002 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 533-80078
Tab 5a 5a
3. Leave User's Manual with owner. Explain system operation
and periodic maintenance requirements outlined in manual.
4. Fill out Dealer Installation Checklist and place in customer
file.
For continuing high performance and to minimize possible equip-
ment failure, periodic maintenance must be performed on this
equipment.
Frequency of maintenance may vary depending upon geographic
areas, such as coastal applications.
Printed in U.S.A.
Form 38BYC-3SI

CARE AND MAINTENANCE

Pg 8
11-02
Replaces: 38BYC-2SI
38byc3si

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

38byg25hbb25hbc25hcd

Table of Contents