Installing Pump & Collection Pan Kit - Hussmann EGP MERCHANDISERS Installation & Operation Manual

E-commerce grocery program
Table of Contents

Advertisement

1-8
D
p
rIp
INSTALLING PUMP & COLLECTION PAN KIT
The bottom drain for defrost water from the evaporator coil of the case is connected to an
evacuation pump, which uses plastic drain tubing to pump the water to the condensate pan
on top of the case. See next page for part list assembly.
Evaporation pan must be installed level and plugged into electrical receptacle. The tubing
should be inspected through its entire length to ensure that it has not been cut, kinked,
obstructed, or damaged during shipping and installation.
Steps:
1.
Remove cover plates.
2.
Connect case wire whip to pump.
6
5
2.
Cable Routed to
Top Electrical
Enclosure
CONNECTOR-3
WIRE
12-18AWG
EXPLODED VIEW
NOTES:
1. APPLICABLE STANDARDS / SPECIFICATIONS
ASME Y14.5M-1994, DIMENSIONS AND TOLERANCES
2. KEY PRODUCT CHARACTERISTICS PER EPR-0006 & IDENTIFIED WITH SYMBOL
3. MATERIAL- N/A
4. REF 3107767
P/N 3143044_C
IpIng
Ground Cable
BLACK
WHITE
K
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
1.
Pump
GREEN
CABLE ROUTING
SCALE 1.35: 1
FRONT VIEW
SCALE 1.35: 1
Pan
Pump & Collection Pan Kit
(sits underneath case)
TUBE-PVC CLEAR 0.250 ID X 0.500 OD
CUT THE PVC PIPE TO
THE SHOWN LENGTH
2.00
TUBE-PVC CLEAR 0.250 ID X 0.500 OD
CUT THE PVC PIPE TO
THE SHOWN LENGTH
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES.
ENCLOSUR
DIAMOND E
THIRD
ANGLE
PROJECTION
P/N
31355
SHEET 2 OF 2

Advertisement

Table of Contents
loading

Table of Contents