B. Installing Vent Components
1. Attach the First Vent Component to the
Starting Collars
To attach the first vent component (3 foot straight pipe
minimum) to the starting collars of the fireplace:
• Apply a 3/8 inch (9.5mm) bead of stove cement around
the inner pipe fireplace starting collar.
• Make sure that the fireplace rope gasket supplied with
the fireplace seals between the first 8-5/8 inch (219mm)
vent component and the fireplace top.
• Lock the vent components into place by sliding the con-
centric pipe sections with four (4) equally spaced interior
beads into the fireplace collar or previously installed com-
ponent end with four (4) equally spaced indented sections.
• When the internal beads of each pipe line up, rotate the
pipe section clockwise about one-quarter (1/4) turn. The
vent pipe is now locked together.
STARTING
COLLAR
FIRST VENT
COMPONENT
Figure 10. Attaching the First Vent Component
to the Starting Collars
WARNING: A 3/8 INCH (9.5MM) BEAD OF STOVE
!
CEMENT MUST BE PLACED AROUND THE INNER
PIPE FIREPLACE STARTING COLLAR BEFORE AT-
TACHING THE FIRST VENT COMPONENT. FAILURE TO
SEAL THIS JOINT MAY CAUSE THE FIREPLACE TO
OPERATE IMPROPERLY. SEE THE DIAGRAM .
WARNING: ENSURE THAT THE FIBERGLASS
!
ROPE GASKET SUPPLIED WITH THE FIRE-
PLACE SEALS BETWEEN THE FIRST VENT COM-
PONENT AND THE FIREPLACE TOP.
2. Continue Adding Vent Components
• Continue adding vent components, locking each succeed-
ing component into place.
• Ensure that each succeeding vent component is secure-
ly fitted and locked into the preceding component in the
vent system.
• 90° elbows may be installed and rotated to any point
around the preceding component's vertical axis. If an el-
bow does not end up in a locked position with the pre-
ceding component, attach with a minimum of two (2)
sheet metal screws.
3/8" (9.5mm)
STOVE
SEALANT
BEAD
1 INCH
(25.4mm)
Figure 11. Adding Venting Components
WARNING: MODEL GRAND-50-D REQUIRES
!
SHIELD SRV570-290 ABOVE THE FIRST 90°
ELBOW IN THE SYSTEM IF CLEARANCE IS LESS
THAN 4 INCHES (102MM). SEE INSTALLATION SHEET
AND HEAT SHIELD SUPPLIED WITH FIREPLACE.
Combustible
Surface
Heat Shield
3' MIN.
(914mm)
Figure 12. Placement of SRV570-290 Heat Shield
First 90
3. Install Support Brackets
For Horizontal Runs - The vent system must be supported
every five (5) feet of horizontal run by a horizontal pipe support.
To install support brackets for horizontal runs:
• Place the pipe supports around the vent pipe.
• Nail the pipe supports to the framing members.
For Vertical Runs - The vent system must be supported
every eight (8) feet (2.4m) above the fireplace flue outlet by
wall brackets.
To install support brackets for vertical runs:
• Attach wall brackets to the vent pipe and secure the wall
bracket to the framing members with nails or screws.
15
3" MIN.