B. Installing Vent Components
1. Attach the First Vent Component to the
Starting Collars
To attach the first vent component to the starting collars
of the fireplace:
• Apply a 3/8 inch (9.5mm) bead of stove cement around
the 5 inch (127mm) fireplace starting collar.
• Slide the first vent section onto the collars attached to
the top of the unit. Use four self tapping screws to se-
cure the outer pipe to the outer collar.
• When the internal beads of each pipe line up, rotate the
pipe section clockwise about one-quarter (1/4) turn. The
vent pipe is now locked together.
STARTING
COLLAR
FIRST VENT
COMPONENT
Figure 9. Attaching the First Vent Component
to the Starting Collars
WARNING: A 3/8 INCH (9.5 MM) BEAD OF
!
STOVE CEMENT MUST BE PLACED AROUND
THE 5 INCH (127 MM) FIREPLACE STARTING COL-
LAR BEFORE ATTACHING THE FIRST VENT COM-
PONENT. FAILURE TO SEAL THIS JOINT MAY
CAUSE THE FIREPLACE TO OPERATE IMPROPER-
LY. SEE THE DIAGRAM .
2. Continue Adding Vent Components
• Continue adding vent components, locking each succeed-
ing component into place.
• Ensure that each succeeding vent component is secure-
ly fitted and locked into the preceding component in the
vent system.
• 90° elbows may be installed and rotated to any point
around the preceding component's vertical axis. If an el-
bow does not end up in a locked position with the pre-
ceding component, attach with a minimum of two (2)
sheet metal screws.
3/8" (9.5mm)
STOVE
SEALANT
BEAD
1 INCH
(25.4mm)
15
Figure 10. Adding Venting Components
3. Install Support Brackets
For Horizontal Runs - The vent system must be supported
every five (5) feet of horizontal run by a horizontal pipe support.
To install support brackets for horizontal runs:
• Place the pipe supports around the vent pipe.
• Nail the pipe supports to the framing members.
For Vertical Runs - The vent system must be supported
every eight (8) feet (2.4m) above the fireplace flue outlet by
wall brackets.
To install support brackets for vertical runs:
• Attach wall brackets to the vent pipe and secure the wall
bracket to the framing members with nails or screws.
FLUE
OUTLET
1 INCH MIN.
(25.4mm)
Figure 11. Installing Support Brackets
WALL BRACKET
WALL STUD
8 FT. (2.4m)