Step 5 - Field Fabricate Ductwork; Step 6 - Rig And Place Unit - Carrier 48TC**16 Installation Instructions Manual

Single package rooftop gas heating/electric cooling unit with puron (r-410a) refrigerant
Hide thumbs Also See for 48TC**16:
Table of Contents

Advertisement

A
B
Fig. 4 - - Unit Leveling Tolerances
Step 5 — Field Fabricate Ductwork
NOTE:
Cabinet return-air static pressure (a negative
condition) shall not exceed 0.35 in. wg (87 Pa) with
economizer or 0.45 in. wg (112 Pa) without economizer.
For vertical ducted applications, secure all ducts to roof curb
and building structure. Do not connect ductwork to unit.
Fabricate supply ductwork so that the cross sectional
dimensions are equal to or greater than the unit supply
duct opening dimensions for the first 18 in. (458 mm) of
duct length from the unit basepan.
Insulate and weatherproof all external ductwork, joints,
and roof openings with counter flashing and mastic in
accordance with applicable codes.
Ducts passing through unconditioned spaces must be
insulated and covered with a vapor barrier.
If a plenum return is used on a vertical unit, the return
should be ducted through the roof deck to comply with
applicable fire codes.
"B"
MAX WEIGHT
UNIT
LB
48TC**16
2130
NOTES:
1. SPREADER BARS REQUIRED — Top damage will occur if spreader bars are not used.
2. Dimensions in ( ) are in millimeters.
3. Hook rigging shackles through holes in base rail, as shown in detail "A." Holes in base rails are centered around
the unit center of gravity. Use wooden top to prevent rigging straps from damaging unit.
C
MAXIMUM ALLOWABLE
DIFFERENCE IN. (MM)
A-B
B-C
A-C
0.5" (13)
1.0" (25)
1.0" (25)
C10001
PLACE ALL SEAL STRIP IN PLACE BEFORE PLACING
UNIT ON ROOF CURB.
914 - 1371
( 36" - 54" )
"C"
"A"
SEE DETAIL "A"
KG
IN
968
116.0
Fig. 5 - - Rigging Details
!
PROPERTY DAMAGE HAZARD
Failure to follow this caution may result in damage
to roofing materials.
Membrane roofs can be cut by sharp sheet metal
edges. Be careful when placing any sheet metal parts
on such roof.
Step 6 — Rig and Place Unit
When the unit is ready to be rigged and no longer will be
lifted by a fork truck, the wood protector under the basepan
must be removed. Remove 4 screws from each base rail.
Wood protector will drop to the ground. See instructions on
the unit base rails.
Keep unit upright and do not drop. Spreader bars are
required. Rollers may be used to move unit across a roof.
Level by using unit frame as a reference. See Table 1 and
Fig. 5 for additional information.
Lifting holes are provided in base rails as shown in Fig. 5.
Refer to rigging instructions on unit.
!
UNIT DAMAGE HAZARD
Failure to follow this caution may result in
equipment damage.
All panels must be in place when rigging. Unit is not
designed for handling by fork truck.
Before setting the unit onto the curb, recheck gasketing on
curb.
DUCT END
DIMENSIONS
A
B
MM
IN
2945
60.5
7
CAUTION
CAUTION
DETAIL "A"
C
MM
IN
MM
1535
59.5
1510
C10774