Initial start-up, inspection, maintenance
Further details regarding the individual steps
(cont.)
8. Remove the cover, and push the
9. Start the system.
flue pipe onto the draught hood.
Instructing the system user
The system installer must hand the operating instructions to the system user
and instruct him/her in the operation of the system.
17