Removal And Reinstallation Of The Operation Panel Or The Front Covers - Mitsubishi Electric A800 Instruction Manual

Hide thumbs Also See for A800:
Table of Contents

Advertisement

2.2
Removal and reinstallation of the operation
panel or the front covers
Removal and reinstallation of the operation panel
• Loosen the two screws on the operation panel.
(These screws cannot be removed.)
To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the operation
panel. After confirming that the operation panel is fit securely, tighten the screws. (Tightening torque: 0.40 to 0.45 N·m)
Removal of the front cover (lower side)
(a)
(a)
Remove the mounting screws to remove the front cover (lower side). (The number of the mounting screws differs by the
capacity.)
(b)
With the front cover (lower side) removed, wiring of the main circuit terminals can be performed.

Removal and reinstallation of the operation panel or the front covers

• Push the upper part of the operation panel and pull the
operation panel to remove.
(b)
INSTALLATION AND WIRING
2
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents