Operation; Bq20Z65 Circuit Module Connection To Cells And System Load/Charger; Circuit Module To Ev2300 Connections - Texas Instruments bq20z65EVM-001 User Manual

Sbs 1.1 impedance track enabled battery management solution evaluation module
Table of Contents

Advertisement

www.ti.com
1. 4-Cell Pack: 1N (BAT–), 1P, 2P, 3P, and 4P (see
2. 3-Cell Pack: 1N (BAT–), 1P, 2P, and then connect 4P and 3P together.
3. 2-Cell Pack: 1N (BAT–), 1P, and then connect 4P, 3P, and 2P together
To start charge or discharge test, connect PRES pin to PACK- pin to set SYS PRES state. To test sleep
mode, disconnect the SYS PRES pin.
Figure 7. bq20z65 Circuit Module Connection to Cells and System Load/Charger
7.2
PC Interface Connection
The following steps configure the hardware for interface to the PC:
1. Connect the bq20z65-based smart battery to the EV2300 using wire leads as shown in
2. Connect the PC USB cable to the EV2300 and the PC USB port.
The bq20z65EVM-001 is now set up for operation.
8

Operation

This section details the operation of the bq20z65 EVSW software.
8.1
Starting the Program
Run bq Evaluation Software from the Start | Programs | Texas Instruments | bq20z65 EVSW menu
sequence. The SBS Data screen
time scan) button is clicked, or when the <Keep Scanning> check box is checked. To disable the scan
feature, deselect <Keep Scanning>.
The continuous scanning period can be set via the | Options | and | Set Scan Interval | menu selections.
The range for this interval is 0 ms to 65535 ms. Only items that are selected for scanning are scanned
within this period.
SLUU353 – June 2009
Submit Documentation Feedback
Table 5. Circuit Module to EV2300 Connections
bq20z65-Based Battery
SMBD
SMBC
VSS
(Figure
8) appears. Data begins to appear once the <Refresh> (single
Section 2.1
for definitions).
EV2300
SMBD
SMBC
GND
bq20z65EVM-001 SBS 1.1 Impedance Track™ Technology
Enabled Battery Management Solution Evaluation Module
Operation
Table
5.
9

Advertisement

Table of Contents
loading

Table of Contents