Lennox LRP14GN Series Installation Instructions Manual page 8

Hide thumbs Also See for LRP14GN Series:
Table of Contents

Advertisement

Return air temperature range between 55°F (13°C)
and 80°F (27°C) must be maintained.
Air filters must be replaced and pre-filters must be
removed upon construction completion.
The input rate and temperature rise must be set per
the unit rating plate.
The heat exchanger, components, duct system, air
filters and evaporator coil must be thoroughly cleaned
following final construction clean-up.
The unit operating conditions (including airflow,
cooling operation, ignition, input rate, temperature
rise and venting) must be verified according to these
installation instructions.
Clearances
All units require certain clearances for proper operation
and service. Refer to Table 1 for the minimum clearances
to combustibles, servicing, and proper unit operation. In
the U.S., units may be installed on combustible floors
made from wood or class A, B, or C roof covering material.
In Canada, units may be installed on combustible floors.
Units must be installed outdoors.
Clearance to combustibles below the unit flue is 10 inches
since the flue points down.
Do not permit overhanging structures or shrubs to
obstruct condenser air discharge outlet, combustion
air inlet, or vent outlet.
Field-Provided Lifting
Spreaders Recommended
Shipping Bracket and Mounting Screws Must be
Removed for Rooftop or Downflow Application
Front of unit
Back of unit
Left side
Right side (from
vent hood)
Base of unit
Top of unit
Minimum clearance to combustible material below the flue
is 10 inches to allow proper dissipation of flue gasses and
temperatures. For any future service, installer must provide
access to screws of top and rear panels.
Table 1. Minimum Clearances
Roof Curb Installation
If a roof curb is used, follow the manufacturer's installation
instructions and be sure that all required clearances are
observed (see Clearances section).
Prior to setting the unit on the roof curb, the shipping
bracket located underneath the unit must be removed.
Remove the two screws in the base rail (located on the
front and rear of the unit). The four screws and the bracket
can be discarded. See Figure 1.
Rigging Unit
Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation.
1.
Connect rigging to the unit base rails using both holes
in each corner.
Figure 1.
Page 8
Clearance to
Clearance for
Combustibles
Service Access
0 in.
0 in.
0 in.
12 in.
0 in.
0 in.
24 in.
0 in.
24 in.
24 in.
0 in.
48 in.

Advertisement

Table of Contents
loading

Table of Contents